410-Acre Hyperscale Campus Site with 115 kV On-Site
& 2–6 MGD Artesian Water – Stoystown, Pennsylvania

Stonebridge Hunting Preserve
253 Wiedenhoft Lane Stoystown, PA 15563
Mobile/Text: 814-242-1454Land Line: 814-893-6187

Why Stonebridge Is a Fantastic Hyperscale Data Center Site

All of the unique requirements for a large data canter are already on the property.

Stonebridge Hyperscale Campus
Stoystown, Pennsylvania

All critical hyperscale infrastructure is already on-site and proven.

This 410-acre (scalable 10–410 acre) campus in the PJM market delivers:

  • 2–6 million gallons/day artesian water from a 343-million-gallon limestone aquifer (see flowing well video above)
  • 115 kV transmission (FirstEnergy) crossing the property + 23 kV / 12 kV three-phase on-site
  • Peoples Natural Gas high-pressure transmission adjacent
  • Comcast Business + Verizon fiber crossing the site (PA Turnpike backbone < 5 mi)
  • 1 mile of frontage on US-30 with three dedicated entrances
  • Elevated, FEMA Zone X (zero flood risk), low seismic/tornado exposure
  • 90 minutes from Pittsburgh’s tech & talent corridor

No off-site easements required. Ready for immediate due diligence.

Stonebridge Campus – 90 miles SE of Pittsburgh

Proven 2–6 Million Gallon/Day Artesian Water Source

One of the largest private artesian wells in the Northeast — flowing continuously since 1950.

  • Source: 343-million-gallon limestone aquifer – fully mapped and documented
  • Proven sustainable yield: 2–6 MGD for 74 consecutive years (4–12× typical 300 MW campus requirement)
  • Self-replenishing 24/7 via precipitation recharge into elevated aquifer
  • 8-inch flowing well with valve control – output adjustable to exact cooling demand
  • No municipal competition, no water-sewer authority, no withdrawal permits required for this volume in Somerset County

Pump-test reports, aquifer maps, and 74-year flow logs available under NDA.

We Have the Hyperscale Data Center Power Requirements

High Voltage Power Lines for Hyperscale Data Center
  • Existing Electrical Power on The Property
    • Two FirstEnergy Corporation Penelec Power Lines cross the heart of the property.
      • Line #1: 115 KV Transmission Line
      • Line #2: 12 KV 3-Phase Line
    • One Rural Electric 23 KV 3-Phase Power Line also exists on the property.
    • We have existing 3-phase power strung to the wellhead.
  • Peoples Natural Gas transmission line is available for gas-powered electrical generation.

There are also potential Green sources of power. That's because the property has:

  • extensive southern exposure for possible solar electric generation;
  • sufficient elevation for potential wind-generated electricity; and
  • lastly, high flow from the artesian well can generate hydroelectric power.

We Have the Hyperscale Data Center Internet Connectivity

High-capacity Comcast and Verizon fiber optic cables cross the Stonebridge property.

Stonebridge Has the Acreage Required for a Hyperscale Data Center

  • Ample Room for Your Business Operations: The well is on a separate ten-acre subdivision with an individual deed.
  • 50 - 400 additional adjoining acres are available to accommodate the biggest Hyperscale Data Center Campus requirements.

Well Water Quality and Specifications

Stonebridge Artesian Well Water Quality
Contact Bob Wiedenhoft at 814-242-1454 for more information.